Industry
Data Centres
Saudi Arabia's AI data-centre wave — Humain, the hyperscalers, sovereign clouds — is building now, with sites opening 2026–27. Physical security for these facilities must be layered (perimeter → building → hall → rack), fast to deploy, and integrated with security operations. No incumbent integrator owns this category in the Kingdom yet.
The challenge
Data centres are built in months, not years. Security design that arrives late becomes retrofit cost and certification delay; layered access, anti-tailgating, and analytics must be in the concrete, not on top of it.
Relevant capabilities
ELV & Integrated DCIM
Structured cabling, extra-low-voltage systems, and data-centre infrastructure monitoring — engineered as one integrated layer.
Explore →HCIS Contracting
End-to-end HCIS Stage 3/4 physical security: design, supply, installation, commissioning, revalidation.
Explore →OT & Cyber Compliance
Fixed-fee gap assessments, remediation, and monitoring against ECC-2 and NCA OT controls — now mandatory for HCIS-regulated operators.
Explore →Plan data-centre security — talk to an engineer.
Have a tender, a site, or a security gap?
Send the tender documents, or just tell us what you’re protecting. An engineer — not a call center — replies within one business day.