Capability
HCIS Contracting
End-to-end HCIS Stage 3/4 physical security: design, supply, installation, commissioning, revalidation.
Overview
HCIS contracting is our licence and our home ground — Stage 3 & 4 delivered end-to-end for energy, water, and industrial clients, from Layla Solar's 97.35 MW plant to Shuaibah 3 and Al Khorayef's Yanbu lube plant.
What we deliver
- —Stage 3/4 design, supply, installation, commissioning
- —CCTV, access control, intrusion detection, personal search
- —Security control rooms and command centers
- —Revalidation and ongoing compliance
Related case studies
Saudi Aramco
SAIS/HCIS detailed design for one of the world’s largest unconventional gas developments.
Read →Saudi Aramco
HCIS security delivery for a Class 1 offshore incremental program — one of Aramco’s largest offshore field expansions.
Read →NEOM (via Air Products)
HCIS security system EPC for the Green Hydrogen Elements project — NEOM’s first industrial anchor.
Read →Al Khafji Joint Operations / Aramco Gulf Operations
A 16-year, 11-program partnership: TETRA radio, biometric access control, and lifecycle maintenance.
Read →ACWA Power
HCIS Stage 3 & 4 security for utility-scale solar portfolio sites, plus radio communications at Ar Rass/Noor.
Read →Saudi Electricity Company
Physical-security systems for the PP12 Expansion CCGT independent power project — power the grid depends on.
Read →SWPC / WTCO
Security systems across the Kingdom’s water-security program: Riyadh Southern Ring, Juranah, Shuaibah 3 IWP, Yanbu 4, Taiba 1 & 2, Rabigh 4.
Read →KFUPM — King Fahd University of Petroleum & Minerals
A 2,500-location IP CCTV system for the Kingdom’s leading university campus in Dhahran.
Read →Al Khorayef (ALMC Yanbu)
HCIS Class-3 physical security for the Al Khorayef lube-oil manufacturing plant in Yanbu.
Read →Have a tender, a site, or a security gap?
Send the tender documents, or just tell us what you’re protecting. An engineer — not a call center — replies within one business day.